• Home
  • News
  • Sports
  • Entertainment
  • Classifieds
  • Columnists
  • Community
  • Contact Us
  • Obituaries
  • Search
  • Business
  • Blogs
  • Entertainment
  • Gas Prices
  • Neighbors
  • Police Reports
  • Publications
  • Schools
  • Subscribe
  • Weather
  • Webcams
  • Calendar
  • Columnists
  • Submit Classified Ad
  • Legal Notices
  • Castell
  • Food-connection
  • Gilchrist
  • Taylor
  • Church
  • Opinions
  • Advertising
  • Newsroom
advertisement: PriceFordChoice
advertisement: Kenmore Air Express advertisement: wildertacoma

Road repairs are planned for Olympic Hot Springs Road

Published on Wed, May 4, 2011
Read More News

Olympic National
Park sources

National Park Service and Federal Highways Administration road construction engineers are continuing to plan and prepare for repairs to both the Olympic Hot Springs Road and the Whiskey Bend Road within Olympic National Park.

 

Both roads are important visitor access routes within the park’s Elwha Valley and also will provide construction access during removal of the Glines Canyon Dam, set to begin this September as part of Elwha River Restoration.

 

Road repairs are planned to begin in mid-May to the “Fisherman’s Corner” area of the Olympic Hot Springs Road, approximately one mile south of the park boundary.

 

These repairs, which involve replacement of failed base material and road surface, will necessitate a three-week closure to all public entry, including pedestrian and bicycle access. Exact dates for the closure have not yet been scheduled, but the road is anticipated to close in mid-May and remain closed through early June, including the Memorial Day weekend. The Elwha and Altair campgrounds also will be closed during this three-week period.

 

Work on the Whiskey Bend Road will begin as soon as possible after repairs are completed to the Olympic Hot Springs Road, with hopes of reopening Whiskey Bend Road by late summer or early fall.

Repairs to the Olympic Hot Springs Road will correct damage caused by slumping of the river bank and nearby road in the Fisherman’s Corner area.

 

Construction will include placement of bank protection, as well as replacement of failed road base material and asphalt.

 

Final designs for repairs to the Whiskey Bend Road are still under way. These repairs will correct extensive damage caused by heavy rains last December.

 

In addition to slide damage, an assessment by road engineers revealed large voids under the road, seriously compromising road safety and stability.

 

The 4.5-mile Whiskey Bend Road remains open at this time to pedestrians, bicyclists and stock users, who should use extra caution when crossing the damaged areas.

 

advertisement: wilderrav4 advertisement: clallamcoop
The Sequim Gazette is located at 147 W. Washington Street in Sequim.
Business hours are Monday through Friday from 8:30 a.m. to 5:00 p.m.

Phone 360-683-3311, or toll free at 800-829-5810. FAX 360-683-6670.
For a complete company directory with contact information please click HERE.

advertisement: EstesforJan12
 
PUBLICATIONS  |  COUPONS  |  SUBSCRIBE

advertisement: Arnoldsfurn051813 advertisement: SpaShopApril2013 advertisement: LesSchwabMobileCrew advertisement: mtviewjan2013 advertisement: GardenWA advertisement: Wilder leaf ad advertisement: bothellantiquing
advertisement: The lodge advertisement: Elwha River Casino advertisement: Windemere advertisement: Fifth Avenue advertisement: Sherwood advertisement: NWNativeExpresssions
© 2009 Sequim Gazette. All rights reserved. 147 West Washington, Sequim, WA 98382 • 360.683.3311 • Email the Webmaster