Pavement repairs on the River Road ramp and at several locations on U.S. Highway 101 will disrupt traffic this week.
Work on the eastbound 101 River Road off-ramp will close the ramp from 7 a.m.-5 p.m. Monday and Tuesday (Aug. 19-20), the state Department of Transportation said.
During the ramp work, drivers will follow a signed detour using South Sequim Avenue.
Pavement repairs are planned in multiple locations along 101 between Kitchen-Dick Road and River Road from Monday through Aug. 22.
Drivers will encounter single lane closures in both directions of the highway at those locations between 7 a.m.-5 p.m. each weekday.
All work is weather dependent and could be rescheduled, Transportation said.